|
MOKAI Manufacturing
|
|
|
|
||
|
MOKAI is built to perform and built to last. Several outside testing facilities assisted in the design and engineering of Mokai. Half scale Hydrodynamic (water tunnel) testing was performed to verify the hull design and drag efficiencies. A Finite Element Analysis was also conducted to determine the maximum yield strength. Download
the MOKAI Specifications (201 KB) |
||